Pharr Office: (956) 702-4111 San Antonio Office: (210) 362-1130

What We Do

The earlier we're in, the more we can do.

Most of a project's cost is decided before the first drawing is finished. ASI's services are built around getting into the room at that point, then carrying the same budget and schedule through construction and turnover.

See how a project moves through ASI →

Services

Five ways to put ASI to work.

Preconstruction

Conceptual budgeting, progressive estimating, constructability review, value analysis, subcontractor market feedback, procurement planning and schedule development.

  • Conceptual and progressive estimates
  • Constructability review
  • Value analysis
  • Long-lead procurement planning
  • Schedule development

General Contracting

Disciplined field execution with superintendent leadership, subcontractor coordination, quality control, schedule management and transparent cost reporting.

  • Superintendent-led field teams
  • Subcontractor coordination
  • Quality control
  • Schedule management
  • Open-book cost reporting

Design Assist

Collaborative delivery that keeps design decisions aligned with budget, constructability, schedule and the owner's project goals.

  • Budget checks at each design milestone
  • Constructability input while drawings are open
  • Schedule impact of design choices

Development Concept Design & Budget Consultation

Early feasibility and cost input for Developers, Owners and Franchisees evaluating sites, building programs and capital requirements.

  • Site evaluation
  • Building program and test fits
  • Capital requirement estimates

MegAACrete AAC

Specialized knowledge in MegAACrete Autoclaved Aerated Concrete and its potential schedule, quality and value advantages.

  • AAC panel building systems
  • Schedule and value comparison against conventional framing
  • Experienced AAC erection crews

Specialty

MegAACrete AAC, built by crews who know it.

Autoclaved aerated concrete is a lightweight precast panel system. ASI has erected it on hotels across Texas and prices it against conventional framing on every project where it makes sense.

  • Schedule

    Large precast panels go up faster than stick framing, so the building is dried in sooner.

  • Quality

    Solid, fire-rated walls and floors with less sound transfer between guest rooms.

  • Value

    Fewer trades on the structure and less time on site, which shows up in the budget.

The ASI Guarantee

We will design a project within 1% of your Project Goals or our time is free.
No change in original scope = No change orders.